The stock around downtown and south Oshawa is 1940s and 1950s, built quickly and insulated to the standard of the day, which is to say barely. Shallow attics, simple gable roofs, and in the masonry houses, empty wall cavities. Top tier, straightforward work. The north Oshawa growth from the 1990s onward measures deeper and is usually a middle-tier or no-tier job.
Oshawa is a scheduled run east along the 401. We batch Durham work, so a few days' notice gets you a better slot.
Typical lead time: Three to five working days. Nothing about the rebate changes with distance — the programme is province-wide — but the diary does, and autumn fills before anything else.
No energy assessment, one measure, and the tier set by the depth we measure before we start.
| What is up there now | Upgraded to | Maximum rebate |
|---|---|---|
| R–12 or less — under about 4 inches | R–50 | $1,250 |
| R–12 to R–25 — about 4 to 8 inches | R–50 | $1,000 |
| R–25 to R–35 — about 8 to 11 inches | R–50 | $800 |
Amounts are set by Enbridge Gas and Save on Energy and are quoted from the programme pages — attic stream, assessment stream — checked September 2026.
You get the depth, the tier, the figure and the photographs whether or not you use us.
Related
Book an attic check
You get the depth, the tier, the dollar figure and the photographs, whether or not you go ahead with us.