The cheapest square metre of comfort you will ever buy, and the only measure in the programme you can claim on its own.
Insulation is the last step, not the first. An attic that is air-sealed at R–40 outperforms one that is loose at R–60, because the heat that matters leaves through gaps, not through fibres. So the order is: seal, ventilate, then insulate.
The rebate tier is set by what is up there now, not by what we install. Everything goes to R–50 regardless; only the cheque changes.
| What is up there now | Upgraded to | Maximum rebate |
|---|---|---|
| R–12 or less — under about 4 inches | R–50 | $1,250 |
| R–12 to R–25 — about 4 to 8 inches | R–50 | $1,000 |
| R–25 to R–35 — about 8 to 11 inches | R–50 | $800 |
| Cathedral or flat roof, R–25 or less | R–28 | $750 |
| Cathedral or flat roof, R–12 or less | R–20 | $650 |
Amounts are set by Enbridge Gas and Save on Energy, quoted here from the programme pages — attic stream and assessment stream — checked 17 September 2026. Programme terms change without notice.
The rebate cannot exceed half the invoice. A $1,900 job in the top tier returns $950, not $1,250. On a typical GTA attic the tier is what lands, but on a small bungalow it is not, and you should know which one you are before you sign.
One attic rebate per home, ever. If a previous owner claimed it, the house has had it. We check before you commit, not after.
Over R–35 and the stream will not pay. If we measure it and the depth is already there, we will say so and price the air sealing and ventilation on their own — which is usually the work that was actually needed.
Both reach R–50. Cellulose is denser, settles predictably, resists air movement better within the layer, and is made from recycled paper. Blown fibreglass is lighter, does not load an old ceiling, and does not absorb water if a roof leak appears later. We choose for the attic in front of us: lightweight ceilings and known leak histories get fibreglass; everything else usually gets cellulose. Nobody should be selling you one on ideology.
No. The attic stream is deliberately the one measure with no pre-work or post-work energy assessment. That is what makes it fast, and it is also why it is capped lower than the assessment pathway.
A straightforward attic is one day. Removal of contaminated insulation first makes it two. We give you the day count before we start, not during.
No. The work is done through the hatch with the machine outside and the hose run in. Most customers stay home.
If it is dry, clean and undisturbed, yes — we blow over it and the depth adds up. If it is wet, mouldy, rodent-fouled or compacted flat, it comes out first. We tell you which on the attic check, with photographs.
Related
Book an attic check
You get the depth, the tier, the dollar figure and the photographs, whether or not you go ahead with us.